Free · no account · browser-only

Put a monthly cost on RMM alert noise.

Use a measured alert baseline to estimate review hours, labor cost, duplicate and non-actionable noise, and the capacity recoverable through a bounded tuning target. The calculator does not reward suppressing alerts without safety evidence.

Your figures stay in this browser. Nothing is uploaded or saved.

Observed alert baseline

Use a representative 14- or 30-day export. Define an alert as one event presented to a human reviewer, not every underlying telemetry sample.

Modeled monthly impact

Results update immediately. Validate a reduction with incident detection and routing evidence before treating it as recovered capacity.

Generated alerts—
Human-reviewed alerts—
Total review hours—
Total review labor cost—
Noise alerts reviewed—
Noise-review labor cost—
Potentially actionable yield—
Recoverable hours at target—
Recoverable monthly labor cost—
Annualized recoverable cost—

Published formulas

Generated alerts = alerts per day × measured days

Reviewed alerts = generated alerts × human-review rate

Review hours = reviewed alerts × minutes per alert ÷ 60

Noise-review cost = reviewed alerts × measured noise share × minutes per alert ÷ 60 × loaded labor rate

Recoverable hours = noise-review hours × bounded noise-reduction target

Worked example with 400 alerts and 200 reviews

Suppose an MSP measures 20 alerts a day across 20 working days and reviews half of them. At six minutes per review and $60 per hour in loaded labor, those 200 reviews take 20 hours and cost $1,200 for the month.

If 40% of reviewed alerts are duplicates or need no action, they account for eight hours and $480. A pilot that removes a quarter of that measured noise could recover two hours and $120 per month at the same workload. Before counting the savings, confirm a fresh test alert still reaches the assigned technician.

For a queue staffed every day, use all days in the measured month and include after-hours reviews. Measure other queues separately when their review times or staffing costs differ.